Task 3 -Personal Project (pre production)
Stuart Vevers
Stuart vevers, graduated from University of Westmister in 1996. Works his first job in Calvin Klein and later on in the year of 2005 joins Mulberry as the creative director. He had also works with different huge design teams such as Bottega Veneta, Givenchy , Louis Vouitton adn Marc Jacobs. On the 25th of June 2013, he is the new executive director of Coach and up till now he is still holding onto the position. 
Style of fashion: unique and authentic American spirit. 
Andre Kim 
Andre Kim, born on August 24th 1935 in Goyang, Gyeonggi, Korea with real name Kim Bong Nam a son of rural farmers and attended Hanyong High School the later enters Kukje Fashion Design Insitute. He is the first ever male fashion designer in South Korea and also first in South Korean to hold fashion show in Paris. Andre Kim is known for designing evening and wedding gowns collection. In 1988, he is the designer for uniforms for the 1988 Seoul Olympic games and also the Chief designer for 1981 Miss Universe Beauty Pageant. Andre Kim has a adopted son and had died from pneumonia on August 12th, 2010 at the age of 75. 
Style of fashion : Bold and elegant extravagant evening and wedding gown. 
Jimmy Choo
Jimmy Choo, born in Penang, Malaysia 1961. At the age of 11, he made his very own first pair of shoes and he then used the craftsmanship learned from his father, a cobbler and create some of the most coveted shoes in the world. Jimmy Choo had made his way to England in the early year of 1980 and studies at the Cordwainers Technical College in Hackney. 
Style of fashion : Fashionable design of Italian craftsmanship. 
Michael Kors
Michael Kors born in August 9th, 1959 at Long Island, New York. He attended the Fashion Institute of Technology and dropped out after two semester. In year 1981, he launches his own women's collection and was big hit. Michael Kors is the judge for Project Runway, 2014 and the designerof the dress for Michelle Obama "The First Lady" official portrait. 
Style of fashion : Luxuriously casual and simply elegant. 
Donatella Versace
Donatella Versace, born in 1955, Italy and had two major fashion influences in her life, Her mother a dressmaker and her brother a building designer. In the late 1970s she had work with her brother as his muse and adviser and in the year 1980, she had then become a designer for the company's versus line. Her brother was murdered in year 1997 and then she had taken over the place of her brother and became the creative director of the Versace Group. 
Style of Fashion:Mostly flamboyant prints with slinky cuts and over the top sexuality. 
The artist I have chosen from my research is Andre Kim the well known evening and wedding gowns designer. 
This is the analysis I had done on Andre Kim's 2009 summer collection.